38th Cost, Operational Performance and Yarn Quality Study
(April to June 2024)
We wish to inform you that the 38th CPQ study (Cost, Operational Performance and Yarn Quality) covering data for the 1st Quarter of 2024-25 (April – June) commences in July 2024.
The study covers both commercial and major operational parameters influencing the profitability of a spinning mill.
All yarn manufacturing units having a minimum installed capacity of 10,000 & above ring spindles (and/or) equivalent open end/ air-vortex spinning positions can utilise this unique study.
A link is provided here to download the questionnaire for the study
Download 38th CPQ questionnaire